As a member of the Information Security team at a small college, you have been made the project manager to install an access control system (ACS) in a dormitory. The ACS will automatically unlock the dormitory doors via an electronic proximity reader and integrate with an existing security camera system. The cameras are designed to face and rotate to record a person as they use their identification card to unlock the door. Create a 3-4 page project plan for this project in which you:Your assignment must:The specific Course Learning Outcomes associated with this assignment are:
Last Completed Projects
topic title | academic level | Writer | delivered |
---|
jQuery(document).ready(function($) { var currentPage = 1; // Initialize current page
function reloadLatestPosts() { // Perform AJAX request $.ajax({ url: lpr_ajax.ajax_url, type: 'post', data: { action: 'lpr_get_latest_posts', paged: currentPage // Send current page number to server }, success: function(response) { // Clear existing content of the container $('#lpr-posts-container').empty();
// Append new posts and fade in $('#lpr-posts-container').append(response).hide().fadeIn('slow');
// Increment current page for next pagination currentPage++; }, error: function(xhr, status, error) { console.error('AJAX request error:', error); } }); }
// Initially load latest posts reloadLatestPosts();
// Example of subsequent reloads setInterval(function() { reloadLatestPosts(); }, 7000); // Reload every 7 seconds });