171 collins street, Melbourne

write about this building by using the below list

• Under construction by Brookfield multiplex
• Construction manager at the time was kevin moore
• Safety co-ordinator Andrew (studied at deakin, architecture and construction graduate)
What systems in place
• Raised floors approx. 450mm in height
• For mechanical ductings
• Cool air distribution from the floor
• Diffuse up using less power
• Concrete slab -> ducts ->floor
• Fitted with ceramic baked class dots.
• Not clear class, solid particles , 40% dotted ceramic panels
• Planning requirement due to fed square and st pauls cathedral
• White façade, backdrop sun transmission reduced, reduce need of blinds
• Pin construction of front façade,
• 6 green star building leading in the UK
• Lighting materials are LED
• Umow and winward structural engineering deisgns
• Sensors on a 15 minute time for lights